Quick answer. A single-room split system is usually fitted, tested and handed over in one day; installers we list put it at 4 to 8 hours per unit. Multi-room and ducted systems take one to four days. Before that comes a survey, often free: 436 of the 1,769 installer listings we hold say so on their own website.
The installer statements below come from our records, each checked against the firm's own website between October and November 2026.
The process at a glance
| Stage | What happens |
|---|---|
| 1. Enquiry | You describe the rooms; some firms give an instant estimate |
| 2. Survey | Room sizing, outdoor unit position, pipe and cable route |
| 3. Quote | Written price with model, kW rating and what is included |
| 4. Install day | Units fixed, pipes run, wiring, drain. Single split: usually one day |
| 5. Commissioning | Pressure test, vacuum, refrigerant charge, performance check, on install day |
| 6. Handover | Controls walk-through, warranty registered |
Install timings below are typical figures from installer websites, not guarantees. Your survey should give you a firm timescale for your home.
Step 1 and 2: the survey
Most installers price after a visit because the job depends on your walls, not just your rooms. Airconcool in London says its free survey confirms the right unit size, system type, outdoor unit location and installation route. Be Cool Group says it books routine install surveys within 48 hours.
Free surveys are common in the South East. Kent has 36 installers on our free survey list for Kent, and Hampshire has 34 on its free survey page. Some firms charge and credit the fee back if you go ahead, so ask before anyone visits.
Before the survey, run the size calculator so you know roughly what kW rating to expect. If a quote comes back far bigger or smaller, ask why.
Step 3: the quote
A good quote names the make, model and kW rating, says where the outdoor unit goes, how much pipe run is included, who does the electrical work and whether VAT is included. Our guide to comparing air conditioning quotes has the full checklist, and the air conditioning cost guide explains what moves the price.
Check the firm's F-gas company certificate. gov.uk says a company must be certified to install equipment containing F gas, and that covers every split system.
Step 4: install day
For a standard split system, the day usually runs like this:
- Indoor unit. A mounting plate goes on the wall and a core hole is drilled through to the outside for the pipes, cable and condensate drain.
- Outdoor unit. Fixed on a ground stand, wall bracket or flat roof. Higher brackets need ladders or access equipment, which can add time.
- Pipework and cable. Two insulated copper pipes and a control cable link the units, often hidden in trunking. Longer runs take longer.
- Drain. The condensate runs out by gravity, or through a small pump where that is not possible.
- Power. The system may need its own circuit from the consumer unit; the quote should say who does that work.
How long installers say it takes:
| Installer | What they say |
|---|---|
| Infinity Energy Services, Southampton | A single split is typically fitted, commissioned and tested in a day; multi-splits usually take longer |
| Polarcool Refrigeration, Maldon | Single-room split typically one day; multi-split one to two days |
| Airvana, London | Single-room installs one day; multi-room or concealed ducted two to four days |
| Airconcool, London | Most standard residential installs 4 to 8 hours per unit |
| CAL Electrical Solutions, Huntingdon | Single-room wall-mounted system usually fitted and commissioned in a day |
| Lenham Air, Kent | Typically installed within a day per room |
The pattern is clear: one room, one day. Each extra indoor unit, a ducted system or a difficult outdoor position adds time. If you are weighing several rooms, our multi-split guide covers the trade-offs.
Step 5: commissioning
This is the part you can't see, and the part that decides how long the system lasts. Be Cool Group lists its commissioning as a pressure test, vacuum, refrigerant charge, performance check and electrical safety test. The pressure test proves the pipe joints hold; the vacuum pulls air and moisture out of the pipes before the refrigerant goes in.
Ask your installer to confirm these steps were done. It is a fair question and a good firm will answer it without fuss.
Step 6: handover and paperwork
You should get a walk-through of the remote or app, the warranty registered with the manufacturer, and any paperwork for the electrical work. gov.uk lists putting in a fixed air-conditioning system among the jobs that might need building regulations approval; if your installer is registered with a competent person scheme, you do not need to apply yourself. Ask how they handle it before work starts.
Many longer warranties need a yearly service to stay valid. Our servicing guide explains what that visit covers.
Planning permission
Whether you need planning permission depends on the type of unit, the building and where the outdoor unit goes, and flats, listed buildings and conservation areas have tighter rules. Read our guides on planning permission in Brighton and Hove and planning permission in London before the survey, so the outdoor unit position on the quote is one you can use.
Questions
Can air conditioning be installed in one day?
How long does a multi-room air conditioning install take?
What happens at an air conditioning survey?
Do I need building regulations approval for air conditioning?
Is it messy to have air conditioning fitted?
Sources
- gov.uk, Building regulations approval: when you need approval and competent person schemes, read 28 Nov 2026
- gov.uk, Company certification to work with F gas, read 28 Nov 2026
Written and checked by Alex Christou. Found a mistake? Tell us; our corrections policy explains what happens next.